Ubiquiti Networks AF-24 Guía de usuario Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 36
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
6. Attach a ground wire:
a. Remove the nut from the Ground Bonding Point.
b. Attach a ground wire (min. 8 AWG or 10 mm
2
) to the lug and
replace the nut to secure the wire.
c. Secure the other end of the ground wire to a grounded
mast, pole, tower, or grounding bar.
WARNING: Failure to properly ground your airFiber
units will void your warranty.
Note: The ground wire should be as short as possible
and no longer than one meter in length.
16
airFiber® AF-24 Quick Start Guide
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 35 36

Comentarios a estos manuales

Sin comentarios